Glow-worm Ultimate 40FF User Manual Page 12

  • Download
  • Add to my manuals
  • Print
  • Page
    / 40
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 11
12
2000225231B
3 Water Systems
METHOD 1
METHOD 2
METHOD 3
SUPPLY STOP
VALVE
SUPPLY
PIPE
HOSE
UNIONS
SERVICING
VALVE
TEMPORARY
HOSE
HEATING
SYSTEM
HEATING
SYSTEM
TEMPORARY
HOSE
HOSE
UNIONS
SERVICING
VALVE
SUPPLY
PIPE
SUPPLY STOP
VALVE
DOUBLE CHECK
VALVE ASSEMBLY
HEATING
SYSTEM
SERVICING
VALVE
SUPPLY
STOP VALVE
SUPPLY
PIPE
HOSE
UNIONS
DOUBLE CHECK
VALVE ASSEMBLY
OVERFLOW
CISTERN
COMBINED
CHECK VALVE
AND VACUUM
BREAKER
PRESSURE
REDUCING
VALVE
0051M
Diagram 3.6
3.16 Filling a Sealed Water System
Provision for filling the system at low level must be made. Three
methods are shown in diagram 3.6. There must be no permanent
connection to the mains water supply, even through a non-
return valve.
3.17 Water Makeup
Provision must be made for replacing water lost from the
system. A make up vessel mounted above the highest point of
the system and connected through a non-return valve to the
system on the return side of either the hot water cylinder or
heating system, see diagram 3.5.
Alternatively provision for make up can be made by a filling loop.
Page view 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 39 40

Comments to this Manuals

No comments