Glow-worm Micron 50FF User Manual Page 16

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 15
16
2000225227C
5 Boiler Installation
5.8 Pump Connection
The pump must be connected to the external controls.
5.9 Testing
Checks to ensure electrical safety must be carried out by a
competent person.
After installation of the system, preliminary electrical system
checks as below should be carried out:
Diagram 5.9
TOP
TURRET
6793
GASKET
SCREWS
(4)
TOP TURRET
FLUE OUTLET
FLUE
DUCT
EXTENSION
Diagram 5.8
MAINS
SUPPLY
230V~50Hz
BLOCK
CONNECTOR
bl
LS N
g/yg/y
g/y
br
b
bl
b
b
Diagram 5.10
SECURING
SCREW
12384
CONTROL
BOX
HINGE PIN
CABLE
CLAMP
GROMMET
Diagram 5.11
7333
TAIL PIPE
TUBING
NUT
AIR VENT
RETURN
FLOW
RUBBER
WASHER
1. Test insulation resistance to earth.
2. Test earth continuity and short circuit of all cables.
3. Test the polarity of the mains.
The installer is requested to advise and give guidance to the
user of the controls scheme used with the boiler.
Fit the casing.
WING NUT
AIR
DEFLECTOR
7665
TAPTITE
SCREWS
(2)
SELF-TAP
SCREWS (2)
Page view 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 27 28

Comments to this Manuals

No comments