Glow-worm Micron 50FF User Manual Page 20

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 19
20
2000225227C
8 Servicing
Diagram 8.2
BAFFLE
(6 off)
12312
REMEMBER: When replacing a part on this appliance, use
only spare parts that you can be assured conform to the safety
and performance specification that we require. Do not use
reconditioned or copy parts that have not been clearly authorised
by Glow-worm.
Products of Combustion Check
Note: To obtain a products of combustion reading, remove the
cap from the sampling point, located on top of the inner casing,
see diagram 8.1.
Connect the analyser tube onto the nipple.
Switch on the electrical supply and gas supply then operate the
boiler.
On completion of the test switch off the electrical supply and the
gas supply, remove analyser tube and replace sampling point
cap.
Servicing
Before servicing turn off the gas and isolate the electrical supply
to the boiler.
After completing a service always test for gas soundness, make
electrical checks and carry out functional check on controls.
Unless stated otherwise all parts are replaced in the reverse
order to removal.
8.1 Access
Remove the boiler case, see diagram 5.1 and Section 5.2.
8.2 Burner
Remove front combustion chamber cover which is secured by
two screws, see diagram 8.3.
Pull back electrode protection sleeve and disconnect electrode
connection along with earth connection, see diagram 8.6.
Remove the burner retaining screw located at the right hand
side of the burner, see diagram 8.4.
When completed, take hold of burner and slide it to the left
clearing the injector and remove. Take care not to damage the
combustion chamber insulation
Use a vacuum cleaner or suitable stiff brush (not wire) to clean
the burner thoroughly, making sure that all the burner ports are
clear and unobstructed.
On refitting and after cleaning the heat exchanger make sure
the burner is fitted correctly, that is, located on the injector and
horizontal.
Note: It is advisable while servicing the burner to check the
combustion chamber insulation and replace if damaged, see
Section 10.10.
8.3 Cleaning Heat Exchanger Flueways
Disconnect the air pressure switch tube connections, red from
fan, both clear tubes from test nipple, see diagram 8.1.
Remove the blue and purple electrical connections from the fan
see diagram 5.5.
If top outlet installation: Remove air deflector, or it may just be
swung back by loosening the wing-nuts, to enable fan assembly
to be removed, see diagram 8.7 and Section 5.3.
Remove the fan assembly complete with the flue elbow, see
diagram 5.5 and Section 5.3.
Place a sheet of paper in the base of the combustion chamber
and over the injector to prevent particles entering.
Remove the baffles, see diagram 8.2.
Diagram 8.1
CLEAR AIR
PRESSURE
TUBES
SAMPLING
POINT
RED AIR
PRESSURE
TUBE
7231
COMBUSTION
CHAMBER COVER
SCREW
Diagram 8.3
6778
Diagram 8.4
7226
BURNER RETAINING
SCREW
BURNER
Page view 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Comments to this Manuals

No comments